PCP R&D Process Updates Q4-2023
Changes to the process website and OnePoint documents in Q4-2023.
Process Website Updates
- See the changelog for details.
New pages
-
New Product Introduction (NPI) (
5bc429f
)- Description of key items in New Product Introduction (NPI)
- Process: Hardware Development
-
Product Lifecycle Management (PLM) - Windchill (
21ab4af
)- Information about Product Lifecycle Management (PLM) in Windchill
- Process: Hardware Development
-
Bugs in multiple releases (
711facf
)- New description of how to manage bugs in multiple releases
- Process: Configuration Management
-
How-to: Handle End-of-Life Software (
e6a124d
)- Added information about how to handle 3rd party software reaching End-of-Life
- Process: 3rd-party and OSS
-
Data Discipline Dashboard (
d7de0f2
)- Information on how to set up a data discipline (product quality) dashboard
- Process: Quality and KPIs
-
Enhancements as bugs (
ebc4be8
17ba45e
)- Enhancements bugs clarification
- Process: Configuration Management
-
Creating schematics or Circuit diagrams (
18b97b5
)- The first version of Circuit Diagrams /schematics guide
- Process: Hardware Development
-
- New guide for Product Test
- Process: Test
-
NGT Metrics,
NGT Management Documentation,
NGT Epics and Features,
NGT Technology Development Projects
(46a7240
)- NGT-specific information added
- Added information about metrics, document management, epics and features for subprojects, technology development projects, etc.
- Learn: NGT
Updated pages
-
How to: Stop and Start Order of manufacturing and delivery of products, Stop and start order Address list (
8d9ecde
)- Clarification of how to issue a start/stop order including Safety and Ex representatives
- Added "GPV" supplier in the start/stop order address list
- Process: Hardware Development
-
Reference: What is an Approved Manufacturer List (AML)? (
257d768
)- Added information on how to manage Customer Part Numbers (CPN)
- Updated information about Single Source component using Manufacturer Part Number (MPM) and Customer Part Number (CPN)
- Changed OpenText to "document management system"
- New references to "CPN update log", "Rules for component descriptions", "Process Control Platform Classification by Identity Numbers for Purchased Articles"
- Process: Hardware Development
-
- Clarification that PCP BP&IS owns the document management process and not R&D
- Added link to OnePCP Document Management System
- Information: General
-
High-speed design formulas (
914193c
)- Updated formulas for the design of high-speed signals
- Process: Hardware Development
-
DoD for L4 Bugs (
caa651a
,5c518f6
)- Clarified how L4 bugs are identified
- Process: L4 and Maintenance
-
- Updated CM process team, Ulf Steen and Fredrik Rosdahl removed
- Updated Safety process team, Fredrik Rosdahl, Nicolas Martin-Vivaldi removed, "Independent Safety Assessor - TuV Sud Rail Gmbh" added
- Information: General
-
Work Item Traceability (
c2551bd
)- Updated Work Item traceability diagram and descriptions
- Process: Configuration Management
-
How to: work with Epics and Features (
2a1d926
)- Clarified details on how to work with "system requirements" / "system epics", and replication
- Process: Requirements
-
List of Document Templates (
84cada8
,eecb1ad
)- Added link to updated RACI table (draft)
- Updated document IDs for the new DMS
- Information: General
-
- Updated to include information about how to handle legacy QMS artifacts for 800xA
- Information: Learn
-
- Added information about certification principles, and updated table with certifications/regulations
- Process: Quality and KPI
-
- NGT Metrics Guidelines (M16 and M24)
- Process: Quality and KPI
-
- Added clarifications to the Deferred Bugs guide
- Process: Configuration Management
-
Standard Bug Template (
da84b93
)- Added the fields Product Issue Number (PIN) and External References with descriptions
- Process: Configuration Management
-
Document Management, List of Document Templates (
581bd96
)- Clarified BP&IS is responsible for document management processes and the DMS tool
- Information added that templates should be fetched using Templafy
- Explanation that legacy templates should only be used for already released systems and products and brownfield (Safety)
- Added who to contact with found issues (PCP-Content-Management@ABB.omnicroft.com)
- Process: Configuration Management, only referring to the BP&IS processes
-
Static Code Analysis (
4a59c95
)- Static Code Analysis guide updated after remarks from Cyber Security
- All new and changed code must be analyzed
- Clarified that the SCA rule set is selected based on standards and best practices
- Process: Software Development
-
Markdown Tutorial, How to edit and review markdown files (
c25afcd
)- Information added about checklists for pull requests
- Added information on how to withdraw a page in PCP R&D QMS
- Process: General
-
DoD and DoR Guideline (
384f029
)- DoD for System Epics and Epics updated with checks for test
- Process: Quality and KPI
-
Agile Requirement Structure (
3fd6408
)- Updated the agile requirements overview picture
- Process: Requirements
-
- Test process updates based on the new description of system and product tests
- Process: Test
-
Hardware Development Process (
2cbe9b6
)- Updated picture with activities and steps
- Process: Hardware Development
-
Considerations in PCB Layout (
3f8eb75
,e90e1d3
)- Updated information about critical signals
- Updated page names and references
- Updated pictures
- Process: Hardware Development
-
Recommended Extensions (
3d5a9e5
,b213550
,80fb273
)- Added information about the Recommended Extensions list
- Added OpenShift to the list of recommended extensions
- Added Terraform to the list of recommended extensions
- Tools
-
List of Document Templates (
771f86f
)- Added EA and Scribe templates to the list of document templates
- Tools
-
PCP R&D QMS training (
17b6321
)- Added PDF printouts of PCP R&D QMS training
- Learn: Training
Minor updates of pages
-
HW Certifications,
What is an Approved Manufacturer List (AML)?,
Reference: Engineering Service Request (ESR) vs Engineering Change Order (ECO),
Reference: High-speed design formulas,
How to: Create a new mechanics design,
Reference: Considerations to make in PCB layout,
Reference: What does the Production Package contain?,
Tutorial: Creating schematics or Circuit diagrams
(b1e0a42
)- Cleanup of titles and headers
- Process: Hardware Development
-
Explosion Protection (
3c704cb
)- Changed categories in frontmatter
- Process: Hardware Development
-
List of Document Templates (
2a10ba6
)- Updated links of Configuration Management templates from NextECM to OnePCP-DMS
- Process: Configuration Management
-
Process Teams (
ad9cf5f
,9e45edc
)- Updated architecture process team
- Updated L4 & Maintenance team
- Information: General
Removed pages
- None
OnePoint Updates for R&D
- None
See OnePoint for details.
Document Template Updates
- Many of the templates migrated to OnePCP DMS are still in "Draft" or "In Review" and waiting for approval.
- 3BSE039313_en_TPF Names on RACI_NEW.xlsm
- The RACI is still a work in progress, but can be useful
Recorded Process Demos
- See process demos for an overview of all performed demos.