Release

The Release process is valid for component, product, and system releases, including limited releases such as roll-ups and expansion packs. It deploys new functionality into production - continuously or on demand - and ensures that all R&D deliverables are ready to release.

Process Overview

Principles

  • Establish release content and associated parts to be released.
  • Determine the delivery media type for the release.
  • Manage the maturity of the release through the release stages.
  • Ensure readiness of the release documentation (3rd-party clearance, cyber security assessment, export control, standards, certificates, etc.).
  • Ensure product release approval before delivery.
  • Provide a release note detailing key characteristics of the release.

Activities

RE

Artifacts

Artifact​Description​RACIReceiver​Comments
Project Description & Plan"Project Plan" focused on a releaseSee IPM processR&DResponsibility of IPM
Document Control PlanList of documents corresponding to a release. Two variants - one for the project, and one for user manuals.See IPM processR&DResponsibility of IPM
Release Version ​Software/hardware version for release​.(R): Release Owner
(A): Stream Owner​
(C): -
(I): -
Operations​-
User DocumentationEnd-user documentation about system, product, or application.(R): Product Owner
(A): Product Manager
(C): Development Team, Product Owner, Test Lead, Safety Engineer
(I): Configuration Manager
PPM-
Release Notes​Summary of the release content, major issues and work-around.​(R): Release Owner
(A): Stream Owner
(C): Development Team, Ex Representative, Release Owner, Technical Coordinator, Test Lead, Safety Engineer, Product Manager
(I): Configuration Manager, Ex Component Responsible
Operations​-
CertificatesCertificates for the releases (Safety, UL, CSA, GM, CE, etc.).(R): Release Owner
(A): -​
(C): -
(I): -
PPM​Responsibility of Certificates
Export Control Artifacts ​Provide the basic information for ECCN classification.​See RACI for details.PPM​PPM responsible, input from R&D
3rd-party IP Risk Analysis ​Legal evaluation of the risks from 3rd-party intellectual property. Also called "Freedom to Operate" or "Clearance".​See Intellectual Property processR&D, PPM​Responsibility of Intellectual Property
IP Risk Register ​Record project IP risks; update according to gate status.​See Intellectual Property processR&D​Responsibility of Intellectual Property
IP Strategy Report ​Project-specific report identifying key areas to focus IP protection efforts on.See Intellectual Property processR&D, PPM​Responsibility of Intellectual Property
OSS Scan & Clearance Report​OSS Clearance report from Black Duck​.(R): Release Owner
(A): Stream Owner
(C): -
(I): -
Stream Owner​Responsibility of 3rd-Party and OSS
Security Assessment ReportApproved security assessment reports for the release.(R): Cyber Security Engineer
(A): Head of Cyber Security
(C): Head of Cyber Security
(I): 3rd party SW engineer, Architect, Development Team, Product Owner, Release Owner, Stream Owner
PPM​Responsibility of Cyber Security
Beta VersionSoftware/hardware version for beta installation​.(R): Release Owner
(A): Stream Owner​
(C): -
(I): -
PPM​-
Beta Site Test ReportFeedback from the beta-site is recorded in a test report​.(R): Release Owner
(A): Stream Owner
(C): -
(I): -​
PPM​PPM responsible, input from R&D.​
Field Upgrade Plan​Plan for upgrading beta sites to the released system and products.(R): Release Owner
(A): Stream Owner
(C): -
(I): -
PPM​PPM responsible input from R&D.​
Note: Cyber Security, Safety, and Ex roles should be considered when applicable.

Dependencies

RE

References

  • TBD
Owner: Release Team